您当前的位置:
首页 >
文章列表页 >
Combined Algorithm for the Fastening Stay Force Determinations in Cantilever Construction by Synthesizing the Zero-displacement and Zero-stress State Control Methods
ENGINEERING AND ENVIRONMENT IN CHALLENGING MOUNTAINOUS REGIONS | 更新时间:2024-08-22
    • Combined Algorithm for the Fastening Stay Force Determinations in Cantilever Construction by Synthesizing the Zero-displacement and Zero-stress State Control Methods

    • 在大跨度拱桥施工领域,专家提出了一种改进零位移法结合无应力状态控制法的复合扣索力计算方法,有效解决了索力优化计算和扣索状态控制问题,为大跨度非对称式钢结构拱肋施工提供了便捷、准确的解决方案。
    • Advanced Engineering Sciences   Vol. 56, Issue 3, Pages: 83-89(2024)
    • DOI:10.15961/j.jsuese.202300186    

      CLC: U448;TU311
    • Published:20 May 2024

      Published Online:12 October 2023

      Received:17 March 2023

      Revised:20 May 2023

    扫 描 看 全 文

  • Yu Yujie,Luo Yongqi,Zhou Wen,et al.Combined algorithm for the fastening stay force determinations in cantilever construction by synthesizing the zero-displacement and zero-stress state control methods[J].Advanced Engineering Sciences,2024,56(3):83–89 DOI: 10.15961/j.jsuese.202300186.

  •  
  •  

0

Views

95

下载量

0

CNKI被引量

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

No data

Related Author

YU Yujie
LUO Yongqi
ZHOU Wen
JIANG Lizhong

Related Institution

Bridge Eng. Co.,Ltd.of China Railway Guangzhou Eng. Group Co.,Ltd.
0