您当前的位置:
首页 >
文章列表页 >
Analysis on Settlement of Existing Tunnel Induced by Twin Tunneling Underneath Based on Energy Method
CIVIL ENGINEERING | 更新时间:2024-11-15
    • Analysis on Settlement of Existing Tunnel Induced by Twin Tunneling Underneath Based on Energy Method

    • 在隧道工程领域,专家基于能量方法,提出了考虑地层损失率差异的双线下穿开挖作用下既有隧道沉降的计算方法,为评估既有隧道受新建隧道穿越施工影响时的纵向变形响应提供理论支持。
    • Advanced Engineering Sciences   Vol. 56, Issue 5, Pages: 203-211(2024)
    • DOI:10.15961/j.jsuese.202201295    

      CLC: U459.3
    • Published:20 September 2024

      Published Online:05 May 2023

      Received:25 November 2022

      Revised:19 March 2023

    移动端阅览

  • Liu Tianyu,Luo Wenjun,Yan Jianwei,et al.Analysis on settlement of existing tunnel induced by twin tunneling underneath based on energy method[J].Advanced Engineering Sciences,2024,56(5):203–211 DOI: 10.15961/j.jsuese.202201295.

  •  
  •  

0

Views

72

下载量

0

CNKI被引量

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Pillar Size Design Method for Deep Mine Based on Energy Theory
Research on the Calculation Method and Characteristics of Periodic Pile Arrangement Based on Artificial Spring Model

Related Author

JIANG Xuehui
YAN Jianwei
LUO Wenjun
LIU Tianyu
Peng YAN
Lixin ZHANG
Kaizong XIA
Wenbo LU

Related Institution

. Research & Development Centre for Underground Technol.of Jiangxi Province, East China Jiaotong Univ.,, Jiangxi
State Key Lab. of Water Resources and Hydropower Eng. Sci., Wuhan Univ.
Lab. of Rock Mechanics in Hydraulic Structural Eng. of Ministry of Education, Wuhan Univ., Wuhan
State Key Lab. of Geomechanics and Geotechnical Eng., Inst. of Rock and Soil Mechanics, Chinese Academy of Sciences
Minmetals Mining Holdings Co., Ltd.
0