您当前的位置:
首页 >
文章列表页 >
Coupled DEM–CFD Method for Landslide–river Blockage–impulse Wave Disaster Chain Simulation and its Application
MECHANISM OF LANDSLIDE–DAMMED LAKE AND ITS CONTROL | 更新时间:2024-01-18
    • Coupled DEM–CFD Method for Landslide–river Blockage–impulse Wave Disaster Chain Simulation and its Application

    • Advanced Engineering Sciences   Vol. 55, Issue 1, Pages: 141-149(2023)
    • DOI:10.15961/j.jsuese.202201012    

      CLC: P642
    • Published:20 January 2023

      Published Online:28 December 2022

      Received:19 September 2022

    扫 描 看 全 文

  • Li Dongyang,Nian Tingkai,Wu Hao,et al.Coupled DEM–CFD method for landslide–river blockage–impulse wave disaster chain simulation and its application[J].Advanced Engineering Sciences,2023,55(1):141–149 DOI: 10.15961/j.jsuese.202201012.

  •  
  •  

0

Views

126

下载量

5

CNKI被引量

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Chain Generation Process of Landslide Blocking River Based on Two-phase Double-point Material Point Method
Dynamic Analysis and Numerical Simulation of Disaster Chain from Landslide,Surge Wave to Glacier Lake Outburst
River Blocking Risk Analysis for the Residual Unstable Masses of the Baige Landslide at the Jinsha River
Instability Probability Analysis of the Cracking Zones at the Site of the Baige Landslide in Jinsha River
Analysis on the Formation Mechanism and Process of Baige Landslides Damming the Upper Reach of Jinsha River,China

Related Author

Xiaodong FU
Xinghong YANG
Qian SHENG
Wenjie DU
Lihua LI
Pengfei WEI
Dong WANG
Zhengxuan XU

Related Institution

State Key Lab. of Geomechanics and Geotechnical Eng., Inst. of Rock and Soil Mechanics, Chinese Academy of Sciences
Univ.of Chinese Academy of Sciences
Yunnan Communications Investment Group Highway Construction Co. Ltd.
Eighth Geological Brigade of Hubei, Xiangyang
China Railway Eryuan Eng. Group Co. Ltd.
0