您当前的位置:
首页 >
文章列表页 >
Reservoir Risk Operation for Flood Control Under Design Flood Uncertainty
HYDRAULIC & CIVIL ENGINEERING | 更新时间:2024-01-10
    • Reservoir Risk Operation for Flood Control Under Design Flood Uncertainty

    • Advanced Engineering Sciences   Vol. 55, Issue 2, Pages: 222-231(2023)
    • DOI:10.15961/j.jsuese.202101116    

      CLC: TV214
    • Published:20 March 2023

      Published Online:26 July 2022

      Received:8 November 2021

    扫 描 看 全 文

  • Guo Aijun,Yang Di,Wang Yimin,et al.Rreservoir risk operation for flood control under design flood uncertainty[J].Advanced Engineering Sciences,2023,55(2):222–231 DOI: 10.15961/j.jsuese.202101116.

  •  
  •  

0

Views

122

下载量

2

CNKI被引量

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Direct Method of Calculating the Manage-flood Based on Division of Dlood Period

Related Author

Jing DING
Shuqi LIANG
Guanghua QIN
Ruihu YAO
Wensheng WANG
熊立华
郭生练
肖义

Related Institution

College of Water Resource & Hydropower, Sichuan Univ.
State Key Lab. of Hydraulics and Mountain River Eng., Sichuan Univ.
武汉大学 水资源与水电工程科学国家重点实验室武汉
武汉大学 水资源与水电工程科学国家重点实验室湖北
武汉大学水资源与水电工程科学国家重点实验室
0