您当前的位置:
首页 >
文章列表页 >
Full Scale Model Tests of Fabricate Support Structure for TBM-excavated Coal Mine Roadways
HYDRAULIC & CIVIL ENGINEERING | 更新时间:2024-01-10
    • Full Scale Model Tests of Fabricate Support Structure for TBM-excavated Coal Mine Roadways

    • Advanced Engineering Sciences   Vol. 55, Issue 2, Pages: 242-251(2023)
    • DOI:10.15961/j.jsuese.202101115    

      CLC: TD353
    • Published:20 March 2023

      Published Online:11 October 2022

      Received:7 November 2021

    扫 描 看 全 文

  • Tang Bin,Sun Changhong,Cheng Hua,et al.Full scale model tests of fabricate support structure for TBM-excavated coal mine roadways[J].Advanced Engineering Sciences,2023,55(2):242–251 DOI: 10.15961/j.jsuese.202101115.

  •  
  •  

0

Views

174

下载量

3

CNKI被引量

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Lateral Stiffness of Bolted Prefabricated Concrete Wall
Study on Directional Shear Creep Characteristics of Rock Mass Controlled by Structural Plane
Numerical Simulation of Dynamic Response and Damage Process for Bridge Under Blast Loading

Related Author

Yachao ZHONG
Fuchao ZHAO
Jiang CHEN
Mingming RAN
Zhaoqiang WANG
Feng XIONG
XIE Jiangwei
JI Lizhi

Related Institution

Lab. of Deep Underground Sci.and Eng. for Ministry of Education, College of Architecture and Environment, Sichuan Univ., Chengdu
Inst. for Disaster Management and Reconstruction, Sichuan Univ.
Failure Mechanics & Eng. Disaster Prevention and Mitigation,Key Lab.of Sichuan Province, Sichuan Univ.
School of Civil Eng.,Southwest JiaoTong Univ.
四川大学 建筑与环境学
0