您当前的位置:
首页 >
文章列表页 >
Analysis of Existing Tunnel Settlement Caused by Undercrossing Construction of Curved Metro Shield Tunnel
HYDRAULIC & CIVIL ENGINEERING | 更新时间:2024-01-18
    • Analysis of Existing Tunnel Settlement Caused by Undercrossing Construction of Curved Metro Shield Tunnel

    • Advanced Engineering Sciences   Vol. 55, Issue 1, Pages: 313-324(2023)
    • DOI:10.15961/j.jsuese.202101018    

      CLC: TU43
    • Published:20 January 2023

      Published Online:26 July 2022

      Received:10 October 2021

    扫 描 看 全 文

  • Jiang Jie,Long Yihang,Ou Xiaoduo,et al.Analysis of existing tunnel settlement caused by undercrossing construction of curved metro shield tunnel[J].Advanced Engineering Sciences,2023,55(1):313–324 DOI: 10.15961/j.jsuese.202101018.

  •  
  •  

0

Views

96

下载量

13

CNKI被引量

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Theoretical Model of Surface Settlement Caused by Curved Shield Tunnelling

Related Author

XU Yang
SHI Wenhao
WANG Yuan
MA Qianli
WU Jinghong

Related Institution

School of Civil Eng., Suzhou Univ. of Sci. and Technol.
Inst. of Urban Underground Space Utilization and Safety Protection Technol.
Beijing Construction Eng. Group
0