Seepage-stress-damage coupling analysis of concrete lining under high internal pressure
|更新时间:2024-11-22
|
Seepage-stress-damage coupling analysis of concrete lining under high internal pressure
“In the field of hydraulic tunnels, experts have proposed a method for determining the physical load of seepage using ABAQUS software, improved the concrete permeability coefficient model, and achieved coupled analysis of seepage stress damage, providing an effective tool for complex tunnel design.”
JIN Junchao,JING Laihong,SONG Zhiyu,et al.Seepage-stress-damage coupling analysis of concrete lining under high internal pressure[J].Advanced Engineering Sciences,XXXX,XX(XX):1‒13.
JIN Junchao,JING Laihong,SONG Zhiyu,et al.Seepage-stress-damage coupling analysis of concrete lining under high internal pressure[J].Advanced Engineering Sciences,XXXX,XX(XX):1‒13. DOI: 10.12454/j.jsuese.202400819.
Seepage-stress-damage coupling analysis of concrete lining under high internal pressure