Abstract:It was very important that during cast in place cantilever segment construction of a concrete girder bridge the elevation of the traveling form had to be adjusted considering the deflection changes induced by solar temperature effects. In this paper
a practical computation method is presented to simulate instantaneous temperature effects of box girder bridges. Formula of instantaneous temperature and instantaneous relative humidity were proposed according to the observation results of Guanyinsha Bridge and the information of local weather condition. The instantaneous maximum temperature of the deck surface at daytime was determined using boundary conditions of heat flow equations. According to the observation
temperature of the deck surface varies along transverse direction with parabolic distribution
and vertical temperature gradients for the left web region and right web region were different. Therefore
for analysis of thermal stresses using the space beam model
the nodal forces were described separately by a double moment. The errors of deflection were about 6% using this method indicating that it may be applied to predict solar temperature effects of concrete bridges during construction.
Priestley M J N,Design of concrete bridge for temperature gradients,American Concrete Institute Journal,1978(5).
Kehlbeck F,刘兴法,太阳辐射对桥梁结构的影响,北京:中国铁道出版社,1981.
Mamdouh M E,Ghall A,Temperature variations in concrete bridges,Journal of Structural Engineering ASCE,1983(10).
Imbsen R A,Vandershaf D E,Schamber R A,Thermal effects in concrete bridge superstructures,National Cooperative Highway Research Program Report,1985.
张晴原,Joe Huang,中国建筑用标准气象数据库,北京:机械工业出版社,2004.
Tan Yiping,Han Dajian,Xu Kaiyan,Study on test of thermal effect on section of concrete bridge and atmospheric temperature:Solutions for box-girder bridge,2006.