Abstract:Effect of setting structure joint for Xiaowan high arch dam is discussed considering thermal stress and water loads from construction period to operation period. A no thickness contact element is presented to simulate structure joint
uniaxial equivalent tensile softening model is adopted as constitutive model of dam concrete. FEM analysis is performed with the whole model and sub model in this paper. The computation results show that the tensile stress on dam heel is released. Setting structure joint on dam heel has little influence on the whole structure of dam. The results can offer theory references for design of Xiaowan High Arch Dam.
关键词
小湾拱坝结构诱导缝有限元子模型
Keywords
Xiaowan High Arch Damstructure jiontFEMsub model method
references
朱伯芳,高季章,陈祖煜,等.拱坝设计与研究[M].北京:中国水利水电出版社,2002.
李瓒,陈兴华,郑建波,等.混凝土拱坝设计[M].北京:中国电力出版社,2000.
Wang Guanglun,Zhang Chuhan,Guo Zhison,et al.Study on upstream bottom-joint for improving the stress conditions of high arch dam[J].Journal of Hydraulic Engineering,1998(1):69-75.[王光纶,张楚汉,郭志松,等.设上游底缝改善拱坝应力状态的研究[J].水利学报,1998(1):69-75.]
Du Chenbin,Ren Qinwen.Effect of base joint on performance of high arch dam[J].Journal of Hydraulic Engineering,2001(5):1-4.[杜成斌,任青文.设底缝对高拱坝工作性态的影响[J].水利学报,2001(5):1-4.]