您当前的位置:
首页 >
文章列表页 >
The Safety Evaluation and Countermeasures to the Oil Pipe Line from LANZHOU to CHONGQING under the Dam-break of Tangjiashan Barrier Lake
更新时间:2023-11-28
    • The Safety Evaluation and Countermeasures to the Oil Pipe Line from LANZHOU to CHONGQING under the Dam-break of Tangjiashan Barrier Lake

    • Advanced Engineering Sciences   Vol. 41, Issue 3, Pages: 78-83(2009)
    • Published:2009,

      Published Online:25 September 2008,

    扫 描 看 全 文

  • Pan Hua-Li, 欧国强, 吕娟. The Safety Evaluation and Countermeasures to the Oil Pipe Line from LANZHOU to CHONGQING under the Dam-break of Tangjiashan Barrier Lake. [J]. Advanced Engineering Sciences 41(3):78-83(2009) DOI:

  •  
  •  
更多指标>

0

Views

294

下载量

0

CNKI被引量

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study on the Incipient Velocity of Tangjiashan Barrier Lake Downstream Area Sediment

Related Author

No data

Related Institution

四川大学 水力学与山区河流开发保护国家重点实验室四川
0